Group 18-01 Ball Balancing Robot: (from left to right) George Risi, Dan Mariano, Kevin Simone, Jeffrey Vo, and Tyler Ney-Smith after the final presentation. |
Tuesday, June 5, 2012
Monday, June 4, 2012
Week 10 Update
This week the final assembly was completed. The bushings were screwed onto the motor shafts. The wheels were pressed onto the bushings. The microcontroller was mounted on the top plate via acrylic brackets. A better suited ball was chosen for a better frictional surface.
New ball with the robot on top.
Microcontroller mounted on the top plate
Side view of the Microcontroller mounting brackets
Top view of the Microcontroller mounting brackets
Subscribe to:
Posts (Atom)